Specialists in Transport & Heavy lift of Wind Energy Components
We lift & transport blades, nacelles, hubs and tower sections of wind turbines across Greece
We own specialised heavy transport and crane lifting equipment in range and capacity, to execute wind power projects from:
- planning
- ship unloading
- heavy lifting and haulage
- transportation & storage
- lift and unloading of all wind turbine parts
- final assembly of the components
We have extendable trailers up to 55 metres to transport wind turbine blades up to 70m long, and trailers designed to transport the tower sections. Working with our country’s most recognised wind power companies, we have transported and lifted hubs, nacelles, blades and complete wind turbines to some of the most remote locations.
We also work with specialised partners to provide cranes of 500tn for the self assembly of the wind turbines and for the electrical connection and assembly of the turbines.
Wind Parks Track Record
DATE | WIND FARM | LOCATION | OWNER | AGREEMENT |
1996 | AG.VARVARA | IRAKLION | ROKAS/IWECO | PARTICIPATED |
1997 | MODI/KSIROLIMNI LASITHI | SITIA | ROKAS | CONTRACTED |
1998 | CHANDRA | SITIA | ENRON AEOLOS | CONTRACTED |
1998 | ANTIA Α’ | EVIA | ROKAS | CONTRACTED |
1999 | MAKRIRACHI Α | EVIA | ROKAS | CONTRACTED |
1999 | MAKRIRACHI Β’ | EVIA | ROKAS | CONTRACTED |
1999 | ANTIA Β’ | EVIA | ROKAS | CONTRACTED |
2001 | KOS | KO | ROKAS/DEI | CONTRACTED |
2001 | LEROS | LEROS | ROKAS/DEI | CONTRACTED |
2001 | SKOPIES/ ZARAKES | EVIA | ROKAS | CONTRACTED |
2001 | SKOPIES/ ZARAKES | EVIA | ROKAS | CONTRACTED |
2002 | KERVEROS/ SAPES | KOMOTINI | ROKAS | CONTRACTED |
2002 | KALOGERO | IRAKLION | ROKAS | CONTRACTED |
2003 | MITATO | SITIA | TERNA | CONTRACTED |
2003 | KERVEROS/ SAPES | KOMOTINI | ROKAS | CONTRACTED |
2004 | PATRIARCHIS/ KEXPO | KOMOTINI | ROKAS | CONTRACTED |
2005 | MEGALI VRISSI | IRAKLION | IWECO ENRON | CONTRACTED |
2005 | CHONOS/ PALAIKASTRO | SITIA | TERNA/ENRON (VESTAS) | CONTRACTED |
2005 | MODI EXTENSION | SITIA | ROKAS | CONTRACTED |
2005 | ALOGORACHI/ ANAVRA | VOLOS | GAMESA/ROKAS | PARTICIPATED |
2008 | MAKRIRACH EXTENSION | EVIA | ROKAS | CONTRACTED |
2008 | VALTETSI | ARKADIA | ENERGON | PARTICIPATED |
2010 | ACHLADOKAMPOS | ARGOLIDA | EL.TECHN ANEMOS/ENERGON | PARTICIPATED |
2010 | ARACHNEO | ARGOLIDA | ROKAS/GAMESA | CONTRACTED |
2015 | VLACHOKERASSIA | ARKADIA | ENERGON | PARTICIPATED |
2015 | SAGA | ARKADIA | EL.TECHN ANEMOS/VESTAS | PARTICIPATED |
2016 | PARTHENI | ARKADIA | AirEnergy | PARTICIPATED |
2016 | DRAGOUNI | ARKADIA | EOLIKI DRAGOUNIOU | PARTICIPATED |
2018 | PERGANTI | ETOLO/NANIA | THEMELI/PERGANTI | CONTRACTED |